(NNJDC) did not undergo any substantial expansions or modifications to its physical
plant during the previous 12-month audit period. This information was confirmed
during interviews with both the Director and the PREA Coordinator. The facility did
complete some software upgrades to their camera system and the PREA was taken
into consideration when these upgrades were made to include ensuring no blind
spots and multiple camera views/angles to ensure coverage.
The Director stated that whenever facility design changes, renovations, expansions,
or modifications are considered, the potential impact on resident safety and the
facility's ability to prevent, detect, and respond to sexual abuse is evaluated as part
of the planning process. He emphasized that resident safety and PREA compliance
are key considerations when assessing any future changes to the physical
environment.
During the facility tour, the auditor observed that NNJDC utilizes a comprehensive
digital video surveillance system consisting of approximately 200+ cameras
positioned throughout both the interior and exterior of the facility. The Director
explained that the camera system consists of digital pan-tilt-zoom (PTZ) cameras
that provide extensive monitoring coverage while supplementing, but not replacing,
direct staff supervision. The auditor observed the camera system from the master
control room and verified that camera coverage provides broad visibility throughout
the facility. The system retains recorded video for approximately four months.
The Director and PREA Coordinator further explained that camera placement is
routinely evaluated to maximize staff supervision and reduce opportunities for
sexual abuse or sexual harassment. In addition to the video surveillance system, the
facility has strategically placed security mirrors throughout the building to minimize
blind spots and enhance visibility in areas where direct observation may otherwise
be limited.
Based on observations made during the site review, the auditor determined that the
facility has implemented appropriate environmental design features and
surveillance technology to support resident safety and PREA compliance. Facility
leadership demonstrated an ongoing commitment to evaluating physical plant
features and monitoring capabilities whenever operational or structural changes are
considered.
Compliance Determination
Based on a review of the Pre-Audit Questionnaire, observations made during the
facility site review, and interviews with the Director and PREA Coordinator, the