This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.
Gaskin and Associates Consulting Group, LLC
Discovery STEM proposal
October 8 2026
8
Current site and operating windows
Discovery STEM Academy is located at 1712 Chestnut Avenue. Its public school page identifies a K-5
school day of 9:20 a.m. to 3:55 p.m. and PEEP Schedule C. The current NNPS schedule adds a
midday preschool exchange and separate half-day and early-dismissal arrangements. Published
times guide the study; they are not measured vehicle movements. [G01-G02]
Published school operation
Traffic review requirement
K-5 normal day 9:20 a.m.-3:55 p.m.
Observe the buildup, loading period and clearance before
and after each bell.
PEEP morning 9:20 a.m.-12:35 p.m.
Confirm actual student handoff, loading and accessible
transport needs.
PEEP afternoon 12:40-3:55 p.m.
Review the five-minute gap between published sessions
against actual movements.
K-5 half day 12:30 p.m.; early dismissal 2:25
p.m.
Use the revised staffing roster, family notice and bus/vehicle
arrangements.
PEEP half day 10:55 a.m.; no afternoon
classes
Confirm the applicable calendar and actual transport plan.
PEEP early day AM ends 11:50 a.m.; PM
11:55 a.m.-2:25 p.m.
Assess the revised midday exchange and dismissal
coverage.
Confirm actual operations before observation
Administration should provide the current admission window, parent-line opening and closing times,
bus schedules, walking arrangements, childcare-provider movements and late-arrival process. Verify
authorized unloading locations and the side of the vehicle used for transfer. Do not infer actual arrival
rules from office hours or the 2023 dispatch requests.
Public and restricted maps
The public family map should identify approved approaches, unloading and walking routes, crossings
and prohibited stops. The restricted operational version should add assigned duties, individual
accommodations and emergency coordination. The historical aerial in Appendix D supplies context
only; a current surveyed or field-verified plan must govern any change.Jump to an indexed page (28 of 28)