INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text 路 Page 24 of 28

Discovery STEM Academy Campus Safety and Traffic Management Proposal

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Gaskin and Associates Consulting Group, LLC Discovery STEM proposal October 8 2026 24 Appendix D Historical campus context The supplied engineering presentation shows Discovery and surrounding approaches. This historical aerial is reproduced for geographic context. Image date and field accuracy are not established; parcel lines are not a substitute for a survey. [R06, slide 1] Historical source image reproduced without adding proposed routing arrows. It does not show an approved present-day circulation or pedestrian plan. A current review should verify Chestnut Avenue and 16th, 17th and 18th street movements, the actual Oak Avenue lot access, child walking paths, loading locations, bus movements and queue effects. Prepare an approved current map from measured conditions before implementing a change.
Jump to an indexed page (28 of 28)

Report a privacy or text-extraction issue through publication requests.