INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text 路 Page 21 of 28

Discovery STEM Academy Campus Safety and Traffic Management Proposal

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Gaskin and Associates Consulting Group, LLC Discovery STEM proposal October 8 2026 21 Appendix A Historical chronology Record dates describe historical activity. They do not establish unchanged conditions today. CFS times are logged event or receipt times, not necessarily the duration of exposure. Date Record Documented event March 3 2022 R02 pp. 107-110 Property-damage CFS at the school address; associated collision facts require review. September 29 2023 R02 pp. 66-69 4:51 p.m. reckless-driving allegation; gone-on-arrival disposition. October 9 2023 R02 pp. 50-55 9:12 a.m. property-damage CFS; no route-causation finding. October 17 2023 R01 / R00 p. 7 Visible school-associated warning about speed, distraction and cross-street drop-off. October-December 2023 R02 / Appendix B Repeated morning traffic-control records, including child- crossing support. January 18 2024 R02 pp. 1-3 3:48 p.m. afternoon traffic-control field event. June 24 2024 R08 p. 23 Most recent crisis-plan review/update date reported in the supplied survey. November 7 2024 R00 p. 9 / R09 Date attributed to the Oak Avenue recommendation; original readable study remains unverified. November 13 2024 R02 pp. 10-12 3:57 p.m. property-damage entry canceled as duplicate; linked event needs reconciliation. November 19 2024 R03 p. 1 Sign work initiated; added-crosswalk comment and restriping request recorded. November 22-25 2024 R04-R05 Recorded 16th and 17th/Chestnut marking work and completion comments. January 10-15 2025 R03 Recorded sign replacement and installation. February 10 2025 R02 pp. 4-6 9:09 a.m. traffic-control event; does not demonstrate engineering work failed. March 11 / April 1 2025 R07 Gaskin escalation and city reply reporting no intended internal route change then. The survey introduction states that submission partially fulfills the statutory audit requirement. The visible traffic-control checkbox in Q5.8 is empty. Neither that option nor any redacted response is treated as a selected SRO benefit. [R08, pp. 1, 5]
Jump to an indexed page (28 of 28)

Report a privacy or text-extraction issue through publication requests.