This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.
Gaskin and Associates Consulting Group, LLC
Discovery STEM proposal
October 8 2026
27
Appendix G Previous project files reviewed
All supplied project files were screened for Discovery-specific evidence, source/version controls and
potential funding relevance. The broader NNPS proposal was used as a design and engagement
reference. The school-specific primary records control the historical findings; cross-project trackers do
not independently corroborate them.
Code and supplied file
Review use and limit
P01 Money Flow Tracker.xlsx
Reviewed workbook structure and relevant finance lanes.
No verified Discovery appropriation or spend trail supports
this proposal.
P02 FY-2026-Adopted-Budget---Ordinances.pdf
Historical adopted budget authority context. Does not
authorize this proposed work.
P03 rag6234 DRAFT REVISED FY2027
Recommended Budget Ordinance March 18 2026
MTax March 23 2026.pdf
Draft and recommended status preserved. Not treated as
an adopted FY2027 funding decision.
P04 Adopted FY2025-FY2029 CIP.pdf
Historical capital context screened. Other Discovery-named
park projects are not Discovery STEM Academy.
P05 FY2027-FY2031 Adopted CIP Final.pdf
PDF p. 9 staged planning/design and construction-funding
framework used for conditional capital planning; no school
allocation assumed.
P06 Adopted Book Line Item Detail PDF.pdf
Chestnut Avenue streetscape line screened. Link to
Discovery safety work and usable funding not established.
P07 Adopted FY2026-FY2030 CIP.pdf
Historical capital context screened. No project-specific
appropriation adopted for this proposal established.
P08 FY2027 Recommended Budget Line Item
Detail.pdf
Chestnut streetscape entry and proposed status preserved;
not used as a ready funding source.
P09 FY2027 Recommended Budget Book FOR
PRINT.pdf
Recommended budget context screened. General school or
Discovery-program references are not school-specific
safety funding.
File titles are condensed only for readability; P01-P16 follow the supplied project-source order. Screening is a relevance and
source-status review, not an audit of every city account, transaction or employee record. No district savings or school-
closure model enters this proposal.Jump to an indexed page (28 of 28)