This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.
Gaskin and Associates Consulting Group, LLC
Discovery STEM proposal
October 8 2026
25
Appendix E Primary source register
Source codes in the proposal identify the record and locator below. A record can establish what was reported without proving
every allegation within it. Duplicate file copies are not counted as independent support.
Code
Document and locator
Use and status
R00
Discovery STEM Campus Safety and Traffic
Management Case Study, March 17 2026, 19 pages.
Supplied original edition; embedded screenshot p. 7 and
reported engineering recommendation p. 9.
R01
October 17 2023 school-associated message,
retained in R00 p. 7.
Visible text reviewed as a supplied incomplete
screenshot; original post authentication remains open.
R02
Calls_For_Service_FINAL_28.pdf, 110 pages; forms
printed March 13 2025.
Identifiers, time/arrival fields and relevant traffic/collision
entries inspected; register in Appendix B.
R03
WO524724ChestnutSTEM.pdf, pp. 1-3.
Sign-order actions/comments and
labor/equipment/material categories verified.
R04
WO524913ChestnutSTEM.pdf, pp. 1-2.
16th/Chestnut marking work and reported charges
verified.
R05
WO524914ChestnutSTEM.pdf, pp. 1-2.
17th/Chestnut marking work and reported charges
verified.
R06
Discovery STEM Diagrams & WO(2).pptx, five slides.
Historical map and proposed sign/crosswalk changes
inspected; no current field survey implied.
R07
RE Urgent Follow-Up on Safety Concerns at
Discovery STEM Academy, three-page email PDF.
April 1 2025 reply p. 1; March 11 escalation pp. 1-3.
Sender observations remain attributed.
R08
Discovery Stem Safety Audit 2023-2024 Redacted
2(2).pdf, 27 pages.
Identification pp. 1-2; Q5.8 empty traffic-control box p. 5;
reported review date p. 23.
R09
Engineering (4).pdf, three-page scan; November 7
2024 study as attributed in R00.
Readable primary study unavailable for verification.
Recommendation remains reported; complete study
required.
R10
Discovery STEM Academy Safety Case Study
Reviewed, October 8 2026, 19 pages.
Reviewed edition compared with available originals; a
prior summary, not independent corroboration.
R11
Gaskin And Associates NNPS Proposal, current
supplied reference version 3, October 8 2026.
Proposal structure, cover and consultant portrait
reference; district alternatives are not imported into this
school proposal.Jump to an indexed page (28 of 28)