INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text 路 Page 25 of 28

Discovery STEM Academy Campus Safety and Traffic Management Proposal

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Gaskin and Associates Consulting Group, LLC Discovery STEM proposal October 8 2026 25 Appendix E Primary source register Source codes in the proposal identify the record and locator below. A record can establish what was reported without proving every allegation within it. Duplicate file copies are not counted as independent support. Code Document and locator Use and status R00 Discovery STEM Campus Safety and Traffic Management Case Study, March 17 2026, 19 pages. Supplied original edition; embedded screenshot p. 7 and reported engineering recommendation p. 9. R01 October 17 2023 school-associated message, retained in R00 p. 7. Visible text reviewed as a supplied incomplete screenshot; original post authentication remains open. R02 Calls_For_Service_FINAL_28.pdf, 110 pages; forms printed March 13 2025. Identifiers, time/arrival fields and relevant traffic/collision entries inspected; register in Appendix B. R03 WO524724ChestnutSTEM.pdf, pp. 1-3. Sign-order actions/comments and labor/equipment/material categories verified. R04 WO524913ChestnutSTEM.pdf, pp. 1-2. 16th/Chestnut marking work and reported charges verified. R05 WO524914ChestnutSTEM.pdf, pp. 1-2. 17th/Chestnut marking work and reported charges verified. R06 Discovery STEM Diagrams & WO(2).pptx, five slides. Historical map and proposed sign/crosswalk changes inspected; no current field survey implied. R07 RE Urgent Follow-Up on Safety Concerns at Discovery STEM Academy, three-page email PDF. April 1 2025 reply p. 1; March 11 escalation pp. 1-3. Sender observations remain attributed. R08 Discovery Stem Safety Audit 2023-2024 Redacted 2(2).pdf, 27 pages. Identification pp. 1-2; Q5.8 empty traffic-control box p. 5; reported review date p. 23. R09 Engineering (4).pdf, three-page scan; November 7 2024 study as attributed in R00. Readable primary study unavailable for verification. Recommendation remains reported; complete study required. R10 Discovery STEM Academy Safety Case Study Reviewed, October 8 2026, 19 pages. Reviewed edition compared with available originals; a prior summary, not independent corroboration. R11 Gaskin And Associates NNPS Proposal, current supplied reference version 3, October 8 2026. Proposal structure, cover and consultant portrait reference; district alternatives are not imported into this school proposal.
Jump to an indexed page (28 of 28)

Report a privacy or text-extraction issue through publication requests.