INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 22 of 75

Newport News Program for Public Information — 2024–2025 Annual Progress Report

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Program for Public Information Annual Progress Report 3.3.3.3 Mapping Materials In order to make actual flood risk map materials available to the public, the City has also undertaken an effort to update a GIS Layer in the City’s GIS library that shows flood risk specific to properties in Newport News – ensuring that Special Flood Hazard Area (SFHA) remains up-to-date and incorporates FEMA map updates and Letter of Map Revision. 3.3.4 Related Efforts 3.3.4.1 Stormwater Master Planning The City has been undertaking a multi-disciplinary stormwater master planning effort, which includes the development of a Stormwater Master Plan, Floodplain Management Plan, and Resilience Plan. A Floodplain Management Plan Committee was established to guide development of the plan, and these meetings were coordinated with the PPI Committee meetings through December 2024, allowing members to participate in both. As a result, many of the outreach efforts included in this annual progress report were developed in coordination with outreach projects identified in the floodplain management plan. The City has also shared information about the PPI and important resources on flood risk while attending public meetings about Newport News’ Resilience Plan and Floodplain Management Plans. 3.3.4.2 Conferences The City seized an opportunity to speak to audiences of floodplain managers at two conferences – for the national Association of State Floodplain Managers (ASFPM) in June 2024 and the Virginia Floodplain Management Association (VFMA) in October 2024 – to deliver crucial information about the overall stormwater master planning effort, CRS, and PPI through an engaging presentation. 3.3.4.3 Grants The City applied for the Community Flood Preparedness Fund (CFPF) Grant, which, if granted, will enable Newport News to create a pilot program that provides resilience assessments and recommendations on how to reduce future flood damage to 150 homeowners in low-income and high-flood risk neighborhoods, annually. 3.3.4.4 Additional Services Lastly, the City has established a formal collaboration with the Conservation and Soil Water Conservation District (CSWCD) through a recently approved Memorandum of Understanding. This partnership is designed to address a critical service gap: while the City cannot utilize Stormwater fees for improvements on private property, collaboration with CSWCD will allow the implementation of VCAP for property owners experiencing private stormwater runoff issues. This new service is being promoted at engagement sessions, internal City meetings, and to anyone who has called 311 to report what was eventually determined to be a private issue. 2024/2025 PPI ACCOMPLISHMENTS 18
Jump to an indexed page (75 of 75)

Report a privacy or text-extraction issue through publication requests.