Program for Public Information Annual Progress Report
Project 2024/2025
Project Lead/Co-lead Timeline & frequency Stakeholders
Type Accomplishments
Install storm surge/high No progress to date,
water mark awareness pole future project.
from the National Hurricane Future Project. Year 1 to Potentially:
Center with an include research and National
informational sign and QR development of Hurricane
I Dewberry
code to the Flood recommendations Center, FEMA,
Information website – (location, funding VA DCR,
installed at a waterfront city sources, etc.) NOAA
park (not adjacent to
residential areas)
Future Project. Flood risk information was
Research opportunities shared with students
Send Youth Emergency to integrate through a kiosk at local
Newport News
I Preparedness Curriculum to Dewberry stormwater and/or school STEM night
Public Schools
local schools flood emergency outreach events. See
content into existing Section 3.3.3.1 for more
curriculum information.
Letters were sent in the
Nelson Kelley-
summers of 2024 and
Insurance
2025. The 2025 letter
Agent
Mail out agent resources Engineering included a postcard for
Annually, as part of CRS member on
T postcard to insurance Department/ lenders, realtors, and
320 outreach effort the
agents Dewberry insurance agents to share
committee to
with their clients. See
leverage his
Section 3.3.2.2 for more
network
information.
Engineering East End Conducted a series of
Presentations to Annually. Potential to
T Department/ Neighborhood community flood
neighborhood associations tie into
Dewberry Alliance; resilience workshops. See
Rotary Club;
2024/2025 PPI ACCOMPLISHMENTS 8Jump to an indexed page (75 of 75)