INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 72 of 88

Marshall Courts Phase VII demolition — September 2024 invitation for bids

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page was read by OCR. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

waivers. Before installing the work, the Cantractor shall examine the drawings and the specifications for compliance with appticable codes and regulations bearing on the work and shall immediately report any discrepancy it may discover to the Contracting Officer. Where the requirements of the drawings and specifications fail to comply with the applicable code or regulation, the Contracting Officer shall modify the contract by change order pursuant to the clause entifled Changes herein to conform to the code or regulation. (b) The Contractor shall secure and pay for all permits, fees, and licenses necessary for the proper execution and completion of the work. Where the PHA can arrange for the issuance of all or part of these permits, fees and licenses, without cost to the Contractor, the contract amount shall be reduced accordingly. 13. Health, Safety, and Accident Prevention (a) In performing this contract, the Contractor shall: (1) @) @) 4 Ensure that no laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his/her health end/or safety as determined under construction safety and health standards promulgated by the Secretary of Labor by regulation; Protect the lives, health, and safety of other persons; Prevent damage to property, materials, supplies, and equipment; and, Avoid work interruptions. (b) For these purposes, the Contractor shall: (1) (2) Comply with regulations and standards issued by the Secretary of Labor at 29 CFR Part 1926. Failure to comply may result in imposition of sanctions pursuant to the Contract Work Hours and Safety Standards Act (Public Law 91-54, 83 Stat. 96), 40 U.S.C. 3701 et seq.; and Include the terms of this clause in every subcontract so that such terms will be binding on each subcontractor, (c) The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to property, materials, ‘supplies, or equipment, and shall report this data in the paaner prescribed by 29 CFR Part (d) The Contracting Officer shall notify the Contractor of any noncompliance with these requirements and of the corrective action required. This notice, when delivered to ‘ithe Contractor or the Contractor's representative at the site of the work, shall be deemed sufficient notice of the noncompliance and corrective action required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to take corrective action promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective aciion has been taken. The Contractor shall not base any claim or request for equitable adjustment for additional time or money on any stop order issued under these circumstances. (@) The Contractor shall be responsible for its subcontractors’ compliance with the provisions of this clause. The Contractor shail take such action with respect to any subcontract as the PHA, the Secretary of Housing and Urban Development, or the Secretary of Labor shall direct as a means of enforcing such provisions. 14, Temporary Heating The Contractor shall provide and pay for temporary heating, covering, and enclosures necessary to properly protect all work and materials against darnage by dampness and cold, to dry out the work, and to facilitate the completion of the work. Any permanent heating equipment used shall be tumed over fo the PHA in the condition and at the time required by the specifications. 15, Availability and Use of Utility Services (a) The PHA shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless atherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged ta the PHA or, where the utility is produced by the PHA, at reasonable rates determined by the Contracting Officer. The Contracior shall carefully conserve any utilities fumished without charge. (b) The Contractor, at its expense and in a manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each ulility used for the purpose of determining charges. Before final acceptance of the work by the PHA, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphemalia. 16. Protection cf Existing Vegetation, Structures, Equipment, Utilities, and Improvements (a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed under this contract, and which do not unreasonably interfere with the work required under this contract. (b) The Contractor shail only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during performance of this contract, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer. (c) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. Prior to disturbing the ground at the construction site, the Contractor shall ensure that all underground utility lines are clearly marked. (d) The Contractor shall shore up, brace, underpin, secure, and protect as necessary all foundations and other parts of existing structures adjacent to, adjoining, and in the vicinity cf the site, which may be affected by the excavations or other operations connected with the construction of the project. (e) Any equipment temporarily removed as a result of work under this contract shall be protected, cleaned, and replaced in the same condition as at the time of award of this contract. Previous editions are obsolete Replaces form HUD-5370-A Page 6 of 19 farm HUD-5370 (1/2014)
Jump to an indexed page (88 of 88)

Report a privacy or text-extraction issue through publication requests.