Marshall Courts Phase VII demolition — September 2024 invitation for bids

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page was read by OCR. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

required in the planning and production of the work. Such requests may be submitted as the need arises, but each such request shall be filed in ample time to permit appropriate action to be taken by all parties involved so as to avoid delay. (h) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated} of all shop drawings, will be retained by the PHA and one set will be retumed to the Contractor. As required by the Contracting Officer, the Contractor, upon completing the work under this contract, shall fumish a complete set of all shop drawings as finally approved. These drawings shall show all changes and revisions made up to the time the work is completed and accepted. (i) This clause shall be included in all subcontracts at any tier. It shall be the responsibility of the Contractor fo ensure that all shop drawings prepared by subcontractors are submitted to the Contracting Officer. machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shell also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection, (2) When required by the specifications or the Contracting Officer, the Contractor shall submit appropriately marked samples (and certificates related to them) for approval at the Contractors expense, with all shipping charges prepaid. The Contractor shall label, or otherwise properly mark on the container, the material or product represented, its place of origin, the name of the producer, the Contractor's name, and the identification of the construction project for which the material or product is intended to be used. (8) Certificates shall be submitted in triplicate, describing each sample submitted for approval and certifying that the material, equipment or accessory complies with contract requirements. The certificates shall 10. As-Built Drawings (a) “As-built drawings,” as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built include the name and brand of the product, name of drawings” shall be synonymous with “Record manutacturer, and the location where produced. drawings.” (4) Approval of a sample shall not constitute a waiver of (b) As required by the Contracting Officer, the Contractor the PHA right to demand full compliance with contract shall provide the Contracting Officer accurate information requirements. Materials, equipment and accessories to be used in the preparation of permanent as-built may be rejected for cause even though samples have drawings. For this purpose, the Contractor shall record an been approved. one set of contraci drawings all changes from the (5) Wherever materials are required to comply with installations originally indicated, and record final locations recognized standards or specifications, such of underground lines by depth from finish grade and by specifications shall be accepted as éstablishing the accurate horizontal offset distances to permanent surface technical qualities and testing methods, but shall not improvements such as buildings, curbs, or edges of govern the number of tests required to be made nor walks. modify other contract requirements. The Contracting (c} This clause shall be included in all subcontracts at any Officer may require laboratory test reports on items tier. It shall be the responsibility of the Contractor to submitted Yor approval or may approve materials on ensure that all as-built drawings prepared by subconiractors are submitted to the Contracting Officer. the basis of data submitted in certificates with samples. Check tests will be made on materials delivered for use only as frequently as the Contracting Officer determines necessary to insure compliance of materials with the specifications. The Contractor will assume all costs of retesting materials which fail to 11. Material and Workmanship (a) All equipment, material, and articles furnished under this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the contract to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of, and as approved by the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract. meet contract requirements and/or testing materials offered in substitution for those found deficient. (6) After approval, samples will be kept in the Project office until completion of work. They may be built into the work after a substantial quantity of the materials they represent has been built in and accepted. (c) Requirements concerning lead-based paint. The Contractor shall comply with the requirements conceming lead-based paint contained in the Lead-Based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846) as imptemented by 24 CFR Part 35. (b)_ Approval of equipment and materials. (1) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other 12. Permits and Codes (a) The Contracior shail give all notices and comply with all equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information conceming the performance, capacity, nature, and rating of the applicable laws, ordinances, codes, rules and regulations. Notwithstanding the requirement of the Contractor to comply with the drawings and specifications in the contract, all work installed shall comply with all applicable codes and regulations as amended by any Previous editions are obsolete Replaces form HUD-5370-A form HUD-5370 (1/2014)
Jump to an indexed page (88 of 88)

Report a privacy or text-extraction issue through publication requests.