Marshall Courts Phase VII demolition — September 2024 invitation for bids

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page was read by OCR. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

(b) The Architect shall serve as the Contracting Officer's technical representative with respect to architectural, Schedule engineering, and design matters related to the work performed under the contract. The Architect may provide direction on contract performance. Such direction shall be within the scope of the contract and may not be of a nature which: (1) institutes additional work outside the scope of the contract; (2) constituies a change as defined in the Changes clause herein; (3) causes an increase or decrease in the cost of the contract; (4) alters the Construction Progress Schedule; or (5) changes any of the other express terms or conditions of the contract. (c) The Architect’s duties and responsibilities may include but shall not be limited to: a Making periodic visits to the work site, and on the basis of his/her on-site inspections, issuing written reports to the PHA which shall include all observed deficiencies. The Architect shall file a copy of the report with the Contractor's designated representative at the site; (2) Making modifications in drawings and technical specifications and assisting the Contracting Officer in the preparation of change orders and other contract iitications for issuance by the Contracting Officer; (8) Reviewing and making recommendations with respect te - (i) the Contractor's construction progress schedules; (ii) the Contractor's shop and detailed drawings: the machinery, mechanical and cther equipment and materials or other articles proposed for use by the Contractor; and, (iv) the Contractors price breakdown and progress payment estimates; and, (4) Assisting in inspections, signing Certificates of Completion, and making recommendations with respect to acceptance of work compieted under the contract. 4, Other Contracts The PHA may undertake or award other contracts for additional work at or near the site of the work under this contract. The Contractor shall fully cooperate with the other contractors and with PHA employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work, heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by PHA employees 5. Pre-construction Conference and Notice to Proceed of the work, and that it has investigated and satisfied itself (a) Within ten calendar days of contract execution, and prior to the commencement of work, the Contractor shall attend a preconstruction conference with representatives of the PHA, its Architect, and other interested parties convened by the PHA. The conference will serve to acquaint the participants with the general plan of the construction operation and all other requirements of the contract. The PHA will provide the Contractor with the date, time, and place of the conference. The contractor shail begin work upon receipt of a written Notice to Procaad from the Contracting Officer or designee. The Contractor shall not begin work prior to receiving such notice, 0) 6. Construction Progress (a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring labor, materials, and equipment). The schedule shail be in the form of a progress chart of Suitable scale to indicate appropriately the percentage of work scheduled for comptetion by any given date during the periad. If the Contractor fails to submit a schedule within the time prescribed, the Contraciing Officer may withhold approval of progress payments or take other remedies under the contract until the Contractor submits the required schedule. (b) The Coniractor shall enter the actual progress on the chart as required by the Contracting Officer, and immediately deliver three copies of the annciated schedule to the Contracting Officer. If the Contracting Officer determines, upon the basis of inspection conducted pursuant to the clause entitled Inspection and Acceptance of Construction, herein that the Contractor is not meeting the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the PHA. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifls, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems hecessary to demonstrate how the approved rate of progress will be regained. (c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosécuting the work with sufficient diligence to ensure completion within the time specified in the Contract. Upon making this determination, the Contracting Officer may terminate the Contractors right to proceed with the work, or any separable pari of if, in accordance with the Default clause of this contract. 7. Site Investigation and Conditions Affecting the Work (a) The Contractor acknowledges that it has taken sieps teasonably necessary to ascertain the nature and location as to the general and local conditions which can affect the work or its cost, including but not limited to, (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads;(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is Previous editions are obsolete Replaces form HUD-5370-A Page 3 of 18 form HUD-5376 (1/2014)
Jump to an indexed page (88 of 88)

Report a privacy or text-extraction issue through publication requests.