INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 68 of 88

Marshall Courts Phase VII demolition — September 2024 invitation for bids

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page was read by OCR. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

1. @ (b) ©) @) ) @ (9) (hy Definitions “Architect” means the person or other entity engaged by the PHA to perform architectural, engineering, design, and other services related to the work as provided for in the contract. When a PHA uses an engineer to act in this. capacity, the terms “architect” and “engineer” shall be synonymous. The Architect shall serve as a technical representative of the Contracting Officer. The Architect's authority is as set forth elsewhere in this contract. “Contract” means the contract entered into between the PHA and the Contractor. It includes the forms of Bid, the Bid Bond, the Performance and Payment Bond or Bonds or other assurance of completion, the Certifications, Representations, and Other Statements of Bidders (form HUD-5370), these General Conditions of the Contract for Construction (form HUD-5370), the applicable wage rate determinations from the U.S, Department of Labor, any ‘special conditions included elsewhere in the contract, the specifications, and drawings. It includes all formal anges to any of those documents by addendum, change order, or other modification. “Contracting Officer’ means the person delegated the au- thority by the PHA to enter into, administer, and/or terminate this contract and designated as such in writing to the Contractor. The term includes any successor Contracting Officer and any duly authorized representative of the Contracting Officer also designated in writing. The Contracting Officer shall be deemed the authorized agent of the PIA in all dealings with the Contractor. “Contractor” means the person or other entity entering Into the contract with the PHA to perform all of the work requited under the contract. “Drawings” means the drawings enumerated in the schedule of drawings contained in the Specifications and as described in the contract clause entitled Specifications and Drawings for Construction herein. “HUD” means the United States of America acting through the Department of Housing and Urban Development including the Secretary, or any other person designated to (a) The Contractor shall furnish all necessary labor, materials, tools, equipment, and transportation necessary for performance of the work. The Contractor shall also furnish all necessary water, heat, light, and power not made available to the Contractor by the PHA pursuant to the clause entitled Availability and Use of Utility Services herein. (b) The Contractor shall perform on the site, and with its own organization, work equivalent to at least [ unless otherwise indicated) of the total amount of work to be performed under the order. This percentage may be reduced by a supplemental agreement to this order if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the PHA. (c) At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work site a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. (d) The Contractor shall be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence, and shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others. The Contractor shall hold and save the PHA, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract. (e) The Contractor shall lay out the work from base lines and bench marks indicated on the drawings and be responsible for all lines, levels, and measurements of all work executed under the contract. The Contractor shall verify the figures before laying out the work and will be held responsible for any error resulting from its failure to do so. act on its behalf. HUD has agreed, subject to the provisions of an (f) The Contractor shall confine all operations {including Annual Contributions Terms and Conditions (ACC), to provide financial assistance to the PHA, which includes assistance in financing the work to be performed under this contract. As defined elsewhere in these General Conditions or the contract documents, the determination of HUD may be required to authorize changes in the work or for release of funds to the PHA for payment to the Contractor. Notwithstanding HUD's role, nothing in this contract shall be construed to create any contractual relationship between the Contractor and HUD. “Project” means the entire project, whether construction or rehabilitation, the work for which is provided for in whole or in part under this contract. “PHA” means the Public Housing Agency organized under applicable state laws which a party to this contract. () “Specifications” means the written description of the technical requirements for construction and includes the oriteria and tests for determining whether the requirements are met. () Work" means materials, workmanship, and manufacture and fabrication of components. 2. Contractor's Responsibility for Work Previous editions are obsolete Replaces form HUD-5370-A Page 2 of 19 storage of materials) on PHA premises to areas authorized or approved by the Contracting Officer. (g) The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. After completing the work and before final inspection, the Contractor shall (1) remove from the premises all scaffolding, equipment, tools, and materials (including rejected materials) that are not the property of the PHA and all rubbish caused by its work; (2) leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer; (3) perform all specified tests; and, (4) deliver the installation in complete and operating condition. (h) The Contractor's responsibility will terminate when all work has been completed, the final inspection made, and the work accepted by the Contracting Officer. The Contractor will then be released from further obligation except as required by the warranties specified elsewhere in the contract. 3. Architect's Duties, Responsibilities, and Authority {a) The Architect for this contract, and any successor, shall be designated in writing by the Contracting Officer. form HUD-5370 (1/2014) ] (42 percent
Jump to an indexed page (88 of 88)

Report a privacy or text-extraction issue through publication requests.