2. Amount due for work performed subsequent to the latest request for payment through the date of
termination.
uo
Reasonable compensation for the actual cost of demobilization incurred by the Contractor as a direct
result of such termination. The Contractor shall not be entitled to any compensation for lost profits or
for any other type of contractual compensation or damage other than those provided by the preceding
sentence. Upon payment for the foregoing, owner shall have no further obligations to the Contractor
of any nature.
4. All claims associated with this termination must be submitted within one (1) year after the effective
date of the termination.
B. In no event shall termination for the convenience of the owner terminate the obligations of the
Contractor's surety on its payment and performance bonds.
TERMINATION FOR DEFAULT: NNRHA may terminate this contract at any time, for the Contractors
failure to perform their contractual obligations and may procure the articles or services from other sources and
hold the defaulting contractor responsible for any resulting costs. NNRHA is not liable for Contractor’s cost on
undelivered work and may be entitled to the repayment of progress payments. All claims associated with this
termination must be submitted within one (1) year after the effective date of the termination.
TESTING AND INSPECTION: NNRHA reserves the right to conduct any test/inspection it may deem
advisable to assure goods and services conform to the specifications. Rejected supplies will be returned at the
vendor's expense. The vendor, at no cost, shall replace materials and components that have been rejected by
NNRHA.
TRANSPORTATION AND PACKAGING: By submitting their bids/offerors, all bidders/offerors certify
and warrant that the price offered for FOB destination includes only the actual freight rate costs at the lowest
and best rate and is based upon the actual weight of the goods to be shipped. Except as otherwise specified
herein, standard commercial packaging, packing and shipping containers shall be used. Ali shipping
containers shall be legibly marked or labeled on the outside with purchase order number, commodity
description, and quantity.
USE OF PREMISES AND REMOVAL OF DEBRIS:
A. The Contractor expressly undertakes, either directly or through its Subcontractor:
1. To perform this Contract in such a manner as not to interrupt or interfere with the
operation of any existing activity on the premises or at the location of the work.
2. To maintain its apparatus, materials, supplies, and equipment in such orderly fashion at the site of the
work as will not unduly interfere with the progress of its work or the work of NNRHA or any other
Contractor.
3. To place upon the work or any part thereof only such loads as are consistent with the safety of that
portion of the work.
4. To effect all cutting, filling or patching of its work required to make the same conform to the solicitations
plans and specifications, and except with the consent of the Project Inspector, not to cut or otherwise alter
the work of any other Contractor. The Contractor shall not damage or endanger any portion of the work
by cutting, patching or otherwise altering any work, or excavation.