This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.
Implementation Plan
Continued from page 63
Near Mid Long
Term Term Term Funding
Themes, Goals and Strategies 1- 5 6 - 10 10+ Partners
Sources
years years years
THEME – Safe Environment and Accessibility
GOAL 3 – Enhance bicycle and pedestrian connectivity,
safety, and accessibility.
STRATEGY 1: Implement the Strategic Network General Fund
recommendations of the Newport News Bicycle and X Engineering CIP
Pedestrian Plan. Grants
STRATEGY 2: Develop appropriate amendments to city
X Planning
regulations to require bicycle parking.
STRATEGY 3: Develop a detailed pedestrian access plan to
better connect neighborhoods to the Warwick Boulevard
Planning
corridor. Reconfigure Warwick Boulevard in Hilton Village X
Engineering
area to install appropriate features to reduce automobile
speeds.
STRATEGY 4: Conduct an analysis to identify and install
enhanced east-west pedestrian crossings at appropriate General Fund
Planning
locations throughout the Warwick Boulevard corridor to X CIP
Engineering
provide connectivity between residential and commercial Grants
areas and direct access to transit.
STRATEGY 5: Upgrade the approach pathways and the
pedestrian and bicycle bridge over Government Ditch
CIP
between Rivermont and Huntington Park to meet ADA X Engineering
Grants
accessibility standards (1:12 maximum grade with landings
for every 2.5 feet of grade change).
STRATEGY 6: Demarcate the park roads in Huntington Parks &
Park as shared-use lanes with sharrows and signage to X Recreation General Fund
facilitate safe bicycle access. Public Works
STRATEGY 7: Reconfigure Warwick Boulevard in Hilton General Fund
Planning
Village area to install appropriate features to reduce X CIP
Engineering
automobile speeds. Grants
64 Greater Hilton Area PlanJump to an indexed page (80 of 80)