INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 61 of 80

Greater Hilton Area Plan — adopted December 10, 2024

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Implementation Plan Near Mid Long Term Term Term Funding Themes, Goals and Strategies 1- 5 6 - 10 10+ Partners Sources years years years THEME – Character Preservation and Enhancement GOAL 1 – Preserve the historic character of Hilton Village. STRATEGY 1: Develop an urban forestry program to facilitate the installation of new trees in accordance with X Parks & Recreation General Fund the original village master plan. STRATEGY 2: Promote and utilize the city’s Façade Development Improvement Grant Program to help improve and General Fund Continuous Treasurer preserve the commercial properties along Warwick Private Sector Private Sector Boulevard. STRATEGY 3: Promote and utilize the city’s Residential NNRHA Rehabilitation Property Tax Abatement Program to protect Continuous Development General Fund the historical integrity of residential structures. Treasurer STRATEGY 4: Improve the aesthetics and safety of alleyways by adding lighting, mirrors, and dumpster X Private Sector Private Sector screening where appropriate. GOAL 2 – Enhance streetscape elements along the Warwick Boulevard corridor to unify the Greater Hilton plan area. CIP STRATEGY 1: Install trees and landscaping, street furniture, Engineering X Grants and pedestrian-scale lighting. Private Sector Private Sector CIP STRATEGY 2: Bury existing power lines along the Warwick Engineering X Grants Boulevard corridor to make room for street trees. Utility Providers CIP STRATEGY 3: Require and utilize green infrastructure and Engineering Continuous Grants grey-water recycling to reduce stormwater runoff. Private Sector Private Sector STRATEGY 4: Add gateway signage to identify key entry City Departments CIP X points along the corridor. Private Sector Grants STRATEGY 5: Preserve the landscaped buffer at the City Departments northeast corner of Warwick Boulevard and J. Clyde Morris Continuous Private Sector Private Sector Boulevard. Greater Hilton Area Plan • Implementation Plan 61
Jump to an indexed page (80 of 80)

Report a privacy or text-extraction issue through publication requests.