INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 24 of 80

Greater Hilton Area Plan — adopted December 10, 2024

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Existing Conditions Bicycle and Pedestrian Infrastructure Road and Drainage Infrastructure The Greater Hilton neighborhoods were built Improvements when the properties were located within The following projects are part of the city’s Warwick County, which was largely rural. As such, capital improvement program and are currently sidewalks are uncommon in the neighborhoods underway. north of Stratford Road but are found in a 1. The James River Shoreline Stabilization small portion of Rivermont, throughout Hilton project includes restoration and Village, Hilton Terrace, and the Brandon Heights stabilization of the shoreline adjacent to neighborhoods. River Road. The proposed improvements will reduce erosion of the existing Parts of Warwick Boulevard have 8-foot wide embankments, loss of shoreline and sidepaths (i.e., widened sidewalks attached to protection of the city’s roadway and the curb), but much of the corridor has 5-foot underground utilities. sidewalks and in a few places, lacks sidewalks altogether. A pedestrian-friendly streetscape 2. The Warwick Boulevard Drainage with widened sidewalks, textured pavement, Improvements project includes installation landscaping, street trees, benches, and decorative of new storm sewer infrastructure lighting occurs only through Hilton Village. between Raleigh Road and Center Avenue. There is a 10-foot wide shared-use path along Warwick Boulevard within a public access 3. The Raleigh Road Drainage easement on Marniers’ Museum property, which Improvements project will increase the together with East Boundary Road (closed to capacity of the existing system to better vehicles), Museum Drive, the River Road – Lion’s handle runoff during major storm events. Bridge walkway, and Museum Parkway allows pedestrians and cyclists to loop around the park. 4. The Main Street Pump Station project includes the creation of a detention pond The Mariners’ Lake Natural Area contains an in Municipal Lane Park and installation of assortment of unpaved hiking and mountain new pumps. biking trails east of Warwick Boulevard. The Noland Trail is an unpaved hiking trail that 5. The James River Drive Force Main project circumnavigates Mariners’ Lake west of Warwick includes installation of a sanitary sewer Boulevard, with several connection points to force main along Warwick Boulevard to adjacent neighborhoods. eliminate the need for septic systems. Bicycle Route No. 1 is an on-street route that 6. The Lions Bridge Dam Improvements originates in Huntington Park and generally project includes reconstruction of follows River Road to Riverside Drive and the earth dam for Mariners’Lake with continues all the way up to the northern city additional shoreline stabilization. limits in Lee Hall. The Birthplace of America Trail (“BoAT”) is part of a regional, active transportation network connecting the Virginia Capital Trail with the Beaches to Bluegrass Trail and Hampton Roads Trail in eastern Virginia. The “Newport News loop” of the trail follows Bicycle Route No. 1 through the plan area and Huntington Park towards the downtown area on to Fort Monroe in Hampton. 24 Greater Hilton Area Plan
Jump to an indexed page (80 of 80)

Report a privacy or text-extraction issue through publication requests.