INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 8 of 43

Newport News MS4 stormwater discharge permit VA0088641 — 2024–2029

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Permit No. VA0088641 Page 7 of 42 and the number and type of each enforcement action taken.  The initial annual report shall include the permittee’s strategy to address maintenance of stormwater management controls that are designed to treat stormwater runoff solely from the individual residential lot on which they are located.  The initial annual report shall include a list of all known land disturbing projects that qualify under the ‘Grandfathering’ provision of the VSMP Regulation found at 9VAC25-870-48.  Each annual report shall include a summary of actions taken by the permittee to implement Part I.B.2.a)1) and 2) of this state permit. b) Retrofitting on Prior Developed Lands From the list of stormwater management projects included in the summary required in Part I.B.1, the permittee shall complete no less than three (3) projects no later than the expiration date of this state permit. Projects implemented to meet the requirements of Part I.D of this state permit (TMDL Action Plan and Implementation for the Chesapeake Bay Special Condition or TMDL Action Plans other than the Chesapeake Bay TMDL) may be used to meet the requirements of this special condition. For retrofit projects that do not serve to meet the requirements of Part I.D, the permittee shall submit a summary of projects implemented during the reporting period with each annual report including type of land use being retrofitted, retrofit performed, completion date or anticipated completion date, total acreage retrofitted, total impervious and pervious acreage, and location by latitude and longitude (in decimal degrees). SPECIFIC REPORTING REQUIREMENTS:  Each annual report shall include a status update for those projects for which implementation began during the reporting period. c) Roadways: Streets, roads, and parking lots maintained by the permittee shall continue to be operated and maintained in a manner to minimize discharge of pollutants, including those pollutants related to deicing or sanding activities. (1) The permittee shall continue to implement its street cleaning program and shall either (a) develop and implement street cleaning program with metrics documenting implementation of a street cleaning program to clean the highest achievable lane miles based on current resources and historical records for approval by the department within 12 months or (b) clean a minimum of 20% of permittee owned or maintained street lane miles with curb and gutter during each reporting year reaching the equivalent of 100% of permittee owned or maintained street lane miles by the end of the permit term. 2) The permittee shall maintain an accurate list of permittee-maintained roads, streets, and parking lots that includes the street name, the miles of roadway not treated by BMPs, and miles of roadway treated with BMPs. 3) The permittee shall implement written protocols for permittee-maintained road, street, and parking lot maintenance, equipment maintenance and material storage designed to minimize pollutant discharge. 4) Within 24 months of permit issuance, the permittee shall develop or review and update, if necessary, its existing procedures for snow and ice management, as well as identify opportunities to implement best management practices that promote efficient management and application of anti-icing and deicing agent applications to any permittee-maintained parking lots, roadways, and sidewalks or other paved surfaces.
Jump to an indexed page (43 of 43)

Report a privacy or text-extraction issue through publication requests.