Permit No. VA0088641 Page 33 of 42 PART II – DEQ BMP WAREHOUSE REPORTING A. For the purpose of Part II of this permit, best management practice or BMP means a practice that achieves quantifiable nitrogen, phosphorus, or total suspended solids reductions including stormwater management facilities, ecosystem restoration projects, annual practices, and other practices approved by the Department for reducing nitrogen, phosphorus, and total suspended solids pollutants. Facilities that solely provide peak flow control as required by the City Code are excluded from the requirements of this section. Inspection and maintenance requirements for these facilities shall be in accordance with all applicable state and local ordinances, regulations, and statutes. In addition, ecosystem restoration projects shall be inspected and maintained in accordance with the protocols developed by the Chesapeake Bay Program or inspection and maintenance plans developed in accordance with the department's Stormwater Local Assistance Fund (SLAF) guidelines. B. No later than October 1 of each year the permittee shall electronically report new BMPs implemented and inspected as applicable between July 1 and June 30 of each year using the DEQ BMP Warehouse. 1. The permittee shall use the DEQ Construction Stormwater Database or other application as specified by the Department to report each stormwater management facility installed after July 1, 2014, to address the control of post-construction runoff from land disturbing activities for which the permittee is required to obtain a General VPDES Permit for Discharges of Stormwater from Construction Activities. 2. The permittee shall use the associated reporting template for stormwater management facilities not reported in accordance with Part II.B.1 including stormwater management facilities installed to control post-development stormwater runoff from land disturbing activities less than one acre in accordance with the Chesapeake Bay Preservation Act regulations (9VAC25-830) if applicable and for which a General VPDES Permit for Discharges of Stormwater from Construction Activities was not required. 3. The permittee shall use the DEQ BMP Warehouse to report BMPs that were not reported in accordance with Part II.B.1. or 2 and were implemented as part of a TMDL action plan to achieve nitrogen, phosphorus, and total suspended solids reductions in accordance with Part I.D.1 or 2. 4. The permittee shall use the DEQ BMP Warehouse to report any BMPs that were not reported in accordance with Part II. B, 1, 2, or 3. 5. The permittee shall use the DEQ BMP Warehouse to report the most recent inspection date for BMPs in accordance with Part I.B.2.h) 1) or 2), or in accordance with Part I.D and the most recent associated TMDL action plan. C. The following information for each new BMP reported in accordance with Part II.B.1, 2, 3, or 4 shall be reported to the DEQ BMP Warehouse as applicable: 1. The BMP type; 2. The BMP location as decimal degree latitude and longitude; 3. The acres treated by the BMP, including total acres and impervious acres; 4. The date the BMP was brought online (MM/YYYY). If the date brought online is not known, the permittee shall use 06/2005; 5. The 6th Order Hydrologic Unit Code in which the BMP is located; 6. Whether the BMP is owned or operated by the permittee or privately owned;
Jump to an indexed page (43 of 43)

Report a privacy or text-extraction issue through publication requests.