Newport News MS4 stormwater discharge permit VA0088641 — 2024–2029

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Permit No. VA0088641 Page 21 of 42 d) To better identify sources, a desktop GIS analysis will be conducted within each watershed to identify sources and conduct a mass input analysis, and nutrient and sediment speciation monitoring shall be performed for the following parameters: 1) Dissolved Organic Phosphorus (DOP) 2) Dissolved Organic Nitrogen (DON) 3) Volatile Suspended Solids (VSS) 4) Nitrate Isotopes (for one year only) e) Monitoring for the parameters listed in Part I.C.1.c) shall be in accordance with Part III.A. of this state permit except as follows: 1) Orthophosphate: Filtering shall be performed upon acceptance of the sample by the laboratory; 2) Orthophosphate: The maximum holding time of the sample is 28 days after immediate freezing; and 3) Preservation of Nitrate plus Nitrite, Ammonia as Nitrogen, Total Kjeldahl Nitrogen, and Total Phosphorus shall be performed upon acceptance of the sample by the laboratory. SPECIFIC REPORTING REQUIREMENTS:  The initial annual report shall include the list of sites to be monitored during the term of the state permit, copies of any related USGS quarterly monitoring reports, and all monitoring protocols (e.g., the existing program, trend analysis, mass input analysis, and nitrate isotope monitoring).  In the second year of the permit cycle, the annual report shall include the results of the USGS GIS mass input analysis of estimate constituent input sources report, to include the interpretation completed by the USGS. This will be the only year these results are reported.  In the second year of the permit cycle, the annual report shall include the results of the nitrate isotope monitoring and analysis, to include the interpretation completed by the USGS. This will be the only year these results are reported.  In the final year of the permit cycle, the annual report shall include the results of the trend analysis to include the interpretation completed by the USGS. This will be the only year these results are reported.  Each annual report shall include a summary of the monitoring results from each sampling protocol and analyses and an interpretation of that data with respect to either the identification of long-term patterns and trends or the progress made towards the identification of said patterns and trends. D. TMDL ACTION PLAN AND IMPLEMENTATION 1. Chesapeake Bay Special Condition The Commonwealth, in its Phase I, Phase II and Phase III Chesapeake Bay TMDL Watershed Implementation Plans (WIPs), committed to a phased approach for MS4 permittees to implement necessary reductions. This state permit requires a cumulative 40% of the L2 scoping run reductions by June 30, 2026, and 100% of the L2 scoping run reductions by June 30, 2028. Conditions of future permits will be consistent with the TMDL or WIP conditions in place at the time of permit issuance. a) Definitions: The Following definitions apply to Part 1.D.1: 1) “Existing Sources” means pervious and impervious urban land uses served by the MS4 as of June 30, 2009.
Jump to an indexed page (43 of 43)

Report a privacy or text-extraction issue through publication requests.