INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 25 of 43

Newport News MS4 stormwater discharge permit VA0088641 — 2024–2029

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Permit No. VA0088641 Page 24 of 42 Table 1b Calculation Sheet for Estimating Existing Source Loads and Reduction Requirements for the James River, Lynnhaven and Little Creek Basins Through (June 30, 2028) A B C D E F G 100% Percentage cumulative Existing developed of L2 reduction Sum of lands as of 6/30/09 required required 100% Loading served by the MS4 reduction by June cumulative rate within the regulated Load Percentage of MS4 required by June 30, 2028 reduction Pollutant Subsource (lbs/ac/yr)1 area (acres)2 (lbs/yr)3 Chesapeake Bay total L2 loading reduction 30, 2028 (lbs/yr)4 (lbs/yr)5 Regulated urban 9.39 9% 100% impervious Nitrogen Regulated urban 6.99 6% 100% pervious Regulated Urban 1.76 16% 100% Impervious Phosphorus Regulated urban 0.5 7.25% 100% pervious 1Edge of stream loading rate based on the Chesapeake Bay Watershed Model 5.3.2 2To determine the existing developed acres required in Column B, permittees should first determine the extent of their regulated MS4 service area. Next, permittees will need to delineate the lands within the regulated area served by the MS4 as pervious or impervious as of the baseline date of June 30, 2009. 3Column C = Column A x Column B 4Column F = Column C x Column D 5Column G = The sum of the subsource cumulative reduction required by June 30, 2028 (lbs/yr) as calculated in Column F.
Jump to an indexed page (43 of 43)

Report a privacy or text-extraction issue through publication requests.