INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 20 of 43

Newport News MS4 stormwater discharge permit VA0088641 — 2024–2029

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Permit No. VA0088641 Page 19 of 42 likelihood of receiving illicit discharges: 4) Each observation point screened may be counted as one station (outfall) screening activity equivalent and counted towards the requirements of Part I.B.2.l)1), however, at least 50% of the minimum annual screening events must include station (outfall) screening; 5) Illicit discharges reported by the public and subsequent investigations may not be counted as screening events; however, once the resolution of the investigation and the date the investigation was closed has been documented, an observation point may be established for future screening events; and 6) The permittee’s dry weather screening program shall use a checklist or mechanism to track the following information for dry weather screening events: (a) The unique outfall identifier for the outfall or observation point; (b) Indication a minimum of 72 hours has passed since the last precipitation event; (c) Site descriptions (e.g., conveyance type and dominant watershed land uses); (d) Observed indicators of possible illicit discharge events such as, floatables, deposits, stains, and vegetative conditions (e.g., dying or dead vegetation, excessive vegetative growth, etc.); (e) Whether or not a discharge was observed; (f) If a discharge was observed, the visual characteristics of the discharge (e.g., odor, color, clarity) and the physical condition of the outfall; and (g) For observation points, the location, downstream outfall unique identifier, and risk factors or rationale for establishing the observation point. SPECIFIC REPORTING REQUIREMENTS:  Each annual report shall include a list of locations upon which dry weather screening was conducted, the results and any follow-up actions including maintenance and/or repair of infrastructure or outfalls performed as a result of the dry weather screening. m) Infrastructure Coordination – The permittee shall coordinate with the Virginia Department of Transportation (VDOT) regarding issues of MS4 physical-interconnectivity as described below: 1) Annual Coordination Meeting – The permittee shall meet annually with VDOT for purposes of overall coordination on priority issues for the permittee’s MS4 Program Plan (including operations and maintenance elements) and TMDL action planning relevant to the interconnectivity of the MS4s. 2) Mapping – The permittee shall inform VDOT of the status of its mapping program, identifying any uncertainty regarding ownership or actual location of MS4 components associated with the physically- interconnected MS4s, and working to resolve such uncertainty. The permittee shall coordinate with VDOT to identify any areas within the permittee’s municipal boundaries that drain to the VDOT MS4. 3) Chesapeake Bay TMDL Action Plans – The permittee shall inform VDOT of the means, methods, and schedule by which the permittee will implement the reductions required by the Chesapeake Bay TMDL Special Condition (Part I.D.1) when those means and methods may impact the physically- interconnected MS4s. The parties are encouraged to cooperate with one another where the siting or design of best management practices (BMPs) may be accelerated or otherwise improved by mutual cooperation. 4) The permittee shall coordinate with VDOT to identify any areas within the permittee’s municipal boundaries that drain to the VDOT MS4 and are unaccounted for in the Chesapeake Bay TMDL Action Plan developed by VDOT or the permittee. The unaccounted areas shall be quantified (acres) in the Chesapeake Bay TMDL Action Plan submitted by the permittee. 5) Other TMDL Action Plans – The permittee shall inform VDOT of TMDL Action Plans and major
Jump to an indexed page (43 of 43)

Report a privacy or text-extraction issue through publication requests.