INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 18 of 19

Newport News MS4 Program Plan — August 2026 update

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

18 City of Newport News 2024-2029 MS4 Program Plan 5.75% during the first MS4 Permit term (July 1, 2016, through June 30, 2021); the City exceeded its requirements during that permit term. An updated Chesapeake Bay TMDL Action Plan for the 2024- 2029 MS4 Permit Cycle was submitted January 21, 2025, to demonstrate how the City will reduce Total Nitrogen and Total Phosphorus by 40% cumulatively by June 30, 2026, and by 100% by June 30, 2028. The current plan is available on the Department of Engineering’s website: www.nnva.gov/2638/TMDL-Action-Plans. Reporting • Each annual report shall include any modifications to the Chesapeake Bay TMDL Action Plan made during the July 1 to June 30 reporting period. (ONGOING) • Each annual report shall include documentation identifying which BMPs were completed within the annual reporting period. (ONGOING) • Each annual report shall include a list of BMPs implemented during the reporting period that weren’t reported to the DEQ BMP Warehouse. (ONGOING). • Each annual report shall include a list of control measures that are expected to be implemented during the next reporting period and the expected progress toward meeting the compliance targets for Total Nitrogen, Total Phosphorus, and Total Suspended Solids. (ONGOING) 2. TMDL Action Plans other than the Chesapeake Bay TMDL The City submitted the Back River & Warwick River TMDL Action Plan on June 22, 2018, to demonstrate how it would meet required reductions in E. coli, Enterococcus and fecal coliform bacteria within the Back and Warwick rivers watersheds. An updated version of this plan was submitted July 23, 2025, which included an evaluation of results achieved by the previous action plan as well as updated strategies for the 2024-2029 MS4 Permit Cycle. The current plan is available on the Department of Engineering’s website: www.nnva.gov/2638/TMDL-Action-Plans. Reporting • Each annual report shall include a summary of actions conducted to implement the local TMDL action plan. (ONGOING) Part I.E. Annual Reporting The City submits an annual report electronically to DEQ no later than October 1 each year for the previous fiscal year (July 1 through June 30). Included are any modifications to the MS4 Program Plan, a certification as per Part II.K of the MS4 Permit, and all reporting requirements listed in the MS4 Permit and in this MS4 Program Plan. Part II. DEQ BMP WAREHOUSE REPORTING BMPs include SWMFs, ecosystem restoration projects, and annual practices that achieve quantifiable nitrogen, phosphorus, or total suspended solids reductions. All new BMPs brought online during the
Jump to an indexed page (19 of 19)

Report a privacy or text-extraction issue through publication requests.