Newport News Chesapeake Bay TMDL Action Plan — 2024–2029 MS4 permit

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

City of Newport News Chesapeake Bay TMDL Action Plan (2024-2029 MS4 Permit Cycle) Governor Drive Stream Restoration and Constructed Wetland BMP The Governor Drive Stream Restoration and Constructed Wetland BMP includes approximately 885 linear feet of stream restoration and a Level 1 constructed wetland. The contributing drainage area is approximately 102.2 acres (43% impervious), and this project will generate approximately 57.87 pounds of phosphorus reduction credit. Construction began in December 2025 and is expected to be completed by summer 2025 for an estimated $2,857,736 or $49,382 per pound TP removed. Grant funding has been awarded through DEQ SLAF. Drainage areas and POC reduction credits were generated by the design engineers. Pollutant numbers will be updated per final as-built conditions. Stream Restoration & Project Type Constructed Wetland BMP Total Area Treated (ac) 102.2 Impervious Area (%) 43% N Reduction (lb/yr) 212.00 P Reduction (lb/yr) 57.87 Estimated Cost for Construction $2,857,736 10
Jump to an indexed page (31 of 31)

Report a privacy or text-extraction issue through publication requests.