This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.
Newport News Repetitive Loss Plan Progress Report
Action Type Examples
Public information activities advise
property owners, potential property
owners, and visitors about the
Map information • Library • Outreach projects • Technical assistance • Real estate
hazards, ways to protect people
disclosure • Environmental education
and property from the hazards, and
the natural and beneficial functions
of local floodplains.
-a
Strategy Source Legend
Hampton Roads Hazard Mitigation Plan
One City, One Future Comprehensive Plan 2040
Nuisance Flooding Report
Floodplain Management Committee Feedback
Appendix A 2: Summary of mitigation strategies along with their assigned action type. The table is color coded to
represent the source of the strategy shown on Table Appendix A 1
Action Action Location Funding Lead Priority Deadline Status
Type Source
Construct new Pump Station HMGP, BRIC, Engineering Medium 2027-2029 Project is in
access road to 49 Virginia CFPF Department the planning
Pump Station 49 stage
on Warwick
Boulevard.
Drainage Lee Hall: Stormwater Engineering Medium 2024 Ongoing.
improvements on Chelsea Place Management Department Design is
Chelsea Place, Fund complete
which will include
8Jump to an indexed page (15 of 15)