INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text · Page 9 of 15

Newport News Repetitive Loss Plan — September 2025 Progress Report

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Newport News Repetitive Loss Plan Progress Report Action Type Examples Public information activities advise property owners, potential property owners, and visitors about the Map information • Library • Outreach projects • Technical assistance • Real estate hazards, ways to protect people disclosure • Environmental education and property from the hazards, and the natural and beneficial functions of local floodplains. -a Strategy Source Legend Hampton Roads Hazard Mitigation Plan One City, One Future Comprehensive Plan 2040 Nuisance Flooding Report Floodplain Management Committee Feedback Appendix A 2: Summary of mitigation strategies along with their assigned action type. The table is color coded to represent the source of the strategy shown on Table Appendix A 1 Action Action Location Funding Lead Priority Deadline Status Type Source Construct new Pump Station HMGP, BRIC, Engineering Medium 2027-2029 Project is in access road to 49 Virginia CFPF Department the planning Pump Station 49 stage on Warwick Boulevard. Drainage Lee Hall: Stormwater Engineering Medium 2024 Ongoing. improvements on Chelsea Place Management Department Design is Chelsea Place, Fund complete which will include 8
Jump to an indexed page (15 of 15)

Report a privacy or text-extraction issue through publication requests.