Newport News Repetitive Loss Plan — September 2025 Progress Report

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Newport News Repetitive Loss Plan Progress Report Action Action Location Funding Lead Priority Deadline Status Type Source Christopher Shores Warwick: Local Engineering Medium 2024 Design is Drainage Christopher Stormwater Department complete Improvements. Shores Fees, CIP and Address repeated subdivision construction flooding in the is underway Christopher Shores subdivision by installing larger storm pipes and additional pipes and inlets to alleviate flooding during tidal events. (Design almost complete) Hilton South Hilton/Brandon CIP Engineering Medium 2027 Ongoing Drainage Heights Department Improvements. Install a new system, designed to current standards, within the City’s right-of-way James River Hilton/Brandon CIP, Local Engineering Medium 2024 Design is Shoreline Heights: James Stormwater Department complete Stabilization. River along Fees Stabilize 720 linear River Rd from feet of shoreline on 9304 to 9508 the James River to River Road address severe erosion and failure 10
Jump to an indexed page (15 of 15)

Report a privacy or text-extraction issue through publication requests.