Seafood Industrial Park: dredging, pier and dock bid tabulation

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

Document page

Page options

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

EVALUATION TABULATION IFB No. 25-4351-6256 Seafood Industrial Park Inner Harbor Dredging, Pier and Dock - North End III - Additive Bid Item Crofton Construction Precon Marine Inc. Ryan Construction CO, INC Seaward Marine W.F. Magann Corporation Services, Incorporated Corporation Selected Line Description Quantity Unit of Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Extended Item Measure Cost Cost Cost Cost Cost 1 Floating 1 Lump $550,000.00 $550,000.00 $799,993.00 $799,993.00 $614,148.68 $614,148.68 $831,492.61 $831,492.61 $500,000.00 $500,000.00 Dock Sum Total $0.00 $0.00 $0.00 $0.00 $0.00 IV - DESIGNATED UNIT PRICES In the event of addition or deductions to the work required by the Contract Documents, the Contractor will be paid extra or shall credit the Owner, as the case may be, on the basis of designated unit prices quoted herein. Prices quoted being sum total compensation payable or creditable for such items or work. It is understood that extra work will not be executed without prior written notice. The designated unit prices are for informational purposes only and will not be used for purposes of award determination. IV - Designated Unit Prices Crofton Construction Precon Marine Inc. Ryan Construction CO, Seaward Marine W.F. Magann Services, Incorporated INC Corporation Corporation Selected Line Item Description Quantity Unit of Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Extended Measure Cost Cost Cost Cost Cost 1 18-inch 1 Vertical $220.00 $220.00 $1,500.00 $1,500.00 $456.00 $456.00 $308.80 $308.80 $83.00 $83.00 Prestressed Lineal Foot Precast Coated Concrete Piles 2 Steel H- 1 Vertical $250.00 $250.00 $1,500.00 $1,500.00 $520.00 $520.00 $273.23 $273.23 $99.00 $99.00 Piles Lineal Foot Total $0.00 $0.00 $0.00 $0.00 $0.00 EVALUATION TABULATION Invitation for Bids - Seafood Industrial Park Inner Harbor Dredging, Pier and Dock - North End Page 4
Jump to an indexed page (4 of 4)

Report a privacy or text-extraction issue through Contact & Corrections.