Seafood Industrial Park: dredging, pier and dock bid tabulation

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

Document page

Page options

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

EVALUATION TABULATION IFB No. 25-4351-6256 Seafood Industrial Park Inner Harbor Dredging, Pier and Dock - North End II - Pier and Dock Crofton Construction Precon Marine Inc. Ryan Construction CO, INC Seaward Marine W.F. Magann Corporation Services, Incorporated Corporation Selecte Lin Description Quanti Unit of Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Extended d e ty Measur Cost Cost Cost Cost Cost Ite e m X 4 Precast Concrete 1 Lump $745,000.00 $745,000.00 $839,335.00 $839,335.00 $602,408.71 $602,408.71 $2,552,953. $2,552,953. $910,000.00 $910,000.00 Elements Sum 66 66 X 5 Cast-In-Place Concrete 1 Lump $260,000.00 $260,000.00 $201,007.00 $201,007.00 $138,050.88 $138,050.88 $247,277.56 $247,277.56 $245,000.00 $245,000.00 Elements Sum X 6 Steel H-Piles 1 Lump $145,000.00 $145,000.00 $221,535.00 $221,535.00 $100,000.00 $100,000.00 $213,116.16 $213,116.16 $270,000.00 $270,000.00 Sum X 7 Timber Substructure 1 Lump $145,000.00 $145,000.00 $75,898.00 $75,898.00 $113,431.80 $113,431.80 $227,604.15 $227,604.15 $275,000.00 $275,000.00 Sum X 8 Fendering and Mooring 1 Lump $375,000.00 $375,000.00 $367,264.00 $367,264.00 $214,679.00 $214,679.00 $550,700.29 $550,700.29 $425,000.00 $425,000.00 Sum X 9 Accessories and Site 1 Lump $175,000.00 $175,000.00 $236,727.00 $236,727.00 $105,678.00 $105,678.00 $289,833.02 $289,833.02 $320,000.00 $320,000.00 Improvements Sum X 10 Electrical Infrastructure 1 Lump $390,000.00 $390,000.00 $391,270.00 $391,270.00 $582,000.00 $582,000.00 $303,086.00 $303,086.00 $390,000.00 $390,000.00 Sum X 11 Mechanical 1 Lump $410,000.00 $410,000.00 $436,324.00 $436,324.00 $116,000.00 $116,000.00 $490,000.00 $490,000.00 $505,000.00 $505,000.00 Infrastructure Sum Total $4,005,000. $4,306,426. $4,047,089. $6,475,660. $5,760,000. 00 00 29 96 00 III - ADDITIVE BID ITEM EVALUATION TABULATION Invitation for Bids - Seafood Industrial Park Inner Harbor Dredging, Pier and Dock - North End Page 3
Jump to an indexed page (4 of 4)

Report a privacy or text-extraction issue through Contact & Corrections.