NOODLE convention — summary of material expenditures

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

June 23, 2026 NOODLE: THE THINKER’S CONVENTION SUMMARY OF MATERIAL EXPENDITURES BUDGET V. ACTUAL Totals: Total Budgeted: $3,050,000 Total Actuals: $3,191,726 Production Build: Budgeted: $1,000,000 --- Actual: $968,850 • Dome + Flooring: $364,200 • Stages: $257,130 • Seating: $33,987 • Fabrication: $22,400 • Decor / Stage Dressings / Flags: $47,953 • Areas throughout festival (F&B, entry, etc.): $40,850 • Fencing / Barricades: $56,730 • Surveys + Plans: $35,000 • Renderings: $25,000 • FOH + BOH Builds: $85,600 NOTES: Includes dome, stages, seating, decor, F&B areas, entryway, flags, fencing, barricades. We originally wanted to bring in three domes for the convention. Because of a restricted budget, we were only able to erect one dome and had to rent out two additional local venues to accommodate the additional spaces for less cost. Ideally, we would have a healthier budget to be able to build multiple domes to add to the environment and overall theme of the conference. This would increase impact creatively and allow for more unique spaces to be built out, and we would be able to offer more seating. As the one dome and the two smaller venues were constantly at capacity. Rentals: Budgeted: $125,000 ---- Actual: $125,217 • Trailers: $30,409 • Restrooms: $31,432 • Tenting + Tables: $38,376 • Venue Rentals: $25,000 NOTES: Includes production trailers, talent trailers restrooms / porta potties, tenting, stanchions, ironclad and coastal venues. We had to rent out to smaller venues to accommodate not being able to have multiple domes. Production Tech: Budgeted: $125,000 ---- Actual: $183,415 • Sound: $42,562 • Lighting: $47,724 • Backline: $43,276 • Additional Tech: $49,853 NOTES: Includes tech build for 4 stages, lighting, sound, screens, radios, internet, backline Talent: Budgeted: $900,000 ---- Actuals: $700,494 • Talent Fees: $673,000 • Travel + Riders: $27,494 NOTES: Includes talent fees for artists and speakers, travel, riders, and talent team. We originally wanted to bring in another big-name act, due to cost restrictions in other areas of the event that required more budget for build, security and staffing, we had to bring this line item down. Security: Budgeted: $125,000 ---- Actuals: $150,000 (exact) Page 1 of 3
Jump to an indexed page (3 of 3)

Report a privacy or text-extraction issue through publication requests.