In accordance with the Federal MUTCD, placement on roadways WITHOUT curb and gutter the placement shall be 12'
minimum to the closest component (pole, panel assembly, camera, etc). On roadways WITH curb and gutter the
placement shall be 2' minimum to the closest component (pole, panel assembly, camera, etc).
Restore or replace the disturbed area back to the original condition.
*****************************TRAFFIC CONTROL***********************************
TTC-1.1 Work Beyond the Shoulder Operation (VWAPM)
TTC-4.1 Stationary Operation on Shoulder (VWAPM)
TTC-35.1 Sidewalk Closure and Bypass Sidewalk Operation (VWAPM)
The approved traffic control typicals shall be modified to allow a gap in the channelizing devices for both private
entrances and public intersections. Additional devices shall be placed in the closed lane(s) on both sides of the opening
to preclude vehicles from entering the closed lane(s).
All sign/device spacing and buffer/taper lengths shall conform with the requirements set forth in the current editions of
the Manual on Uniform Traffic Control Devices (MUTCD) and/or the Virginia Work Area Protection Manual (VWAPM).
*****************************ADDITIONAL COMMENTS*******************************
By working under the authority of this permit the permittee agrees to abide by all terms, conditions and restrictions as
specified on this permit.
Vehicles and pedestrians shall not pass under the work area or under any lines that are not secure. Traffic shall be
stopped when work is being preformed across the roadway.
All curb, gutter and sidewalk within the right-of-way must be protected from damage at all times. Contact the inspector
prior to beginning work in order for the area to be visually inspected. If you do not have the curb, gutter and sidewalk
inspected prior to work, you will be responsible for repairing any/all damage to the curb, gutter and/or sidewalk.
Vehicle and equipment staging shall not block lanes of travel.
All debris from construction activity shall be removed as it is generated.
Call Construction Inspection at 757-933-2311 prior to starting work and again anytime work is being performed within
the right-of-way. This is required for inspection and/or notification purposes.
NOTICE: The approved permit and traffic control plan must be on site at all times.