Seaview status and resident support: adopted April 11, 2023 minutes

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

Document page

Page options

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

Background • Seaview Lofts is a privately owned market rate, 15 story, 150-unit apartment building. The building was constructed in the early-1970’s, and as such is not equipped with a sprinkler system. In Feb. 2020, the building was purchased by Seaview Lofts LLC. • March 10, 2022 - inspection found three (3) significant building deficiencies:  a boiler problem caused the building to have no heat  egress doors were not functional  Elevator Car 2 was shut down due to an equipment failure • April 11, 2022 - the City received complaints from tenants that both elevators were broken which meant some ambulatory residents could not travel the stairways and the height of the building made emergency rescue operations exceedingly more difficult. Due to the severity of the situation a fire watch was ordered to safeguard against the risk of fire. • April 18, 2022 - The City petitioned the Circuit Court for an emergency mandatory injunction requiring that Seaview LLC complete the cited repairs by April 24, 2022. 3 Background • Following the April 18th court hearing, Fire Marshal’s Office (FMO) and Codes Compliance returned to Seaview Lofts to evaluate the Seaview Mgmt.’s relocation efforts of the residents and review repair progress. FMO/Codes Compliance found the HVAC boiler in dire disrepair, electrical hazards in equipment rooms, a boiler issue that caused a major leak and problems with the building’s fire alarm system. FMO locked out the boiler to prevent carbon monoxide poisoning and explosion. Citations were issued for the additional hazards. • April 19, 2022 - City officials appeared in Circuit Court for a second hearing to obtain a second emergency mandatory injunction for the above hazards. • Over the next two months, City staff would learn that Seaview on-site management did not have the capacity to address the problems they faced. Examples include (a) the on-site manager did not have significant purchase authority, (b) no appropriately licensed repair staff employed and (c) several area contractors were unwilling to work at Seaview. As a result, conditions continued to devolve to an unacceptable level. • Over the next two months no significant progress was made to address the hazardous conditions cited and conditions actually worsened. On June 28, 2022 the Court ordered the building condemned within 48 hours due to the following:  Boiler hazards  Fire alarm system, emergency egress and lighting  Elevators out of service  HVAC chiller 4 Page 18 of 21
Jump to an indexed page (21 of 21)