Newport News Interim Local Resilience Plan drainage infrastructure ranges from 12-inch diameter driveway culverts up to 73-foot-wide open channels, all ultimately discharging into tidally influenced water bodies. The City's aging stormwater system presents a logistical challenge, requiring increased inspections, maintenance, rehabilitation, and replacement over the next several decades (Figure 2). Newport News continues to update and modernize the stormwater infrastructure in the older urbanized areas, given that historical design standards and regulations did not account for future upstream volumes or existing downstream capacity. Due to the age of some of the infrastructure, in some locations this historical infrastructure was constructed without a formal design. Given the City's location along the coast, the projected SLR will impact many City watersheds dramatically. The City is experiencing more frequent and intense storm events that are increasing localized and nuisance flooding. It continues to proactively integrate these climate change realities and additional State legislative and policy requirements into its programs to protect life, limb, and property Figure 2. The City’s Aging Stormwater System Built to Meet Historically Less within the Newport News jurisdictional boundary. Stringent Design Standards Presents a Logistical Challenge (Photo: Harlech Place, Purpose of a Resilience Plan August 2020) In 2016, the Virginia General Assembly enacted the Virginia Shoreline Resiliency Fund. In 2020, the fund’s priorities were expanded to address inland flooding, and the fund was renamed the Virginia Community Flood Preparedness Fund (CFPF). Localities must use CFPF money “primarily for the purpose of implementing flood prevention and protection projects and studies in areas that are subject to recurrent flooding as confirmed by a locality-certified floodplain manager.” 1 Projects in low-income geographic areas, provide community-scale hazard mitigation, and integrate nature-based solutions are prioritized. Local government capital projects only qualify for CFPF if the locality has a Virginia Department of Conservation and Recreation (DCR) approved local Resilience Plan. Local Resilience Plans may be a single document or a combination of documents that together address nine specific elements: 1. Project Based, 2. Nature Based, 3. Social Equity, 4. Flooding/Repetitive Loss, 5. Property Acquisition, 6. Debris Management, 7. Substantial Damage/Improvement, 8. Regional Coordination & Schedule, and 9. Best Science & Mapping. Descriptions of each of these Local Resilience Plan elements are presented in Appendix A. 1 2023 Funding Manual for the Virginia Community Flood Preparedness Fund 7|Page
Jump to an indexed page (34 of 34)

Report a privacy or text-extraction issue through publication requests.