This page was read by OCR. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.
(2)
(8)
2)
(10)
ay
4924-8886-8988, v. 12
of default, then the Parties agree that the necessary repair, maintenance or
upkeep work may be done by EDA, with EDA鈥檚 actual and reasonable third-
party, out of pocket expenses to be reimbursed by Developer from time to
time and in keeping with this covenant.
All exterior walls shall be constructed of permanent materials impervious
to deterioration in appearance, such as stone, exposed aggregates, brick,
block, pre-cast panels, concrete, glass, EFIS (exterior finishing insulation
systems), or hardiplank siding.
To the extent permitted by applicable Anti-Terrorism Force Protection
(ATFP) requirements, any service area, facility or equipment located on a
side of the Property which is adjacent to a public right-of-way, is to be
enclosed.
No landscaping, improvements or structures, whether temporary or
permanent in nature, shall be constructed, commenced or erected on the
Property unless and until the plans, working drawings, specifications and
materials therefor have been approved in writing by the City in all material
respects to the extent required by Applicable Laws (as defined below) and
copies thereof have been provided to the EDA.
Gas, electric and other utility services shall be underground to the Property
from the main distribution. No utility line or connection to any utility line
at or above ground level shall be permitted.
Only the EDA shall have the right, power and authority to enforce the
foregoing covenants.
10
Jump to an indexed page (37 of 37)