Flock right-of-way permit ROW-2023-0645

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

All lane closures and most shoulder closures require the use of ARROWBOARDS regardless of the roadway posted speed limit. Modifications of traffic control and the use of steel plates, due to field conditions, are subject to approval by the City Inspector. The approved traffic control typicals shall be modified to allow a gap in the channelizing devices for both private entrances and public intersections. Additional devices shall be placed in the closed lane(s) on both sides of the opening to preclude vehicles from entering the closed lane(s). All sign/device spacing and buffer/taper lengths shall conform with the requirements set forth in the current editions of the Manual on Uniform Traffic Control Devices (MUTCD) and/or the Virginia Work Area Protection Manual (VWAPM). *****************************ADDITIONAL COMMENTS******************************* By working under the authority of this permit the permittee agrees to abide by all terms, conditions and restrictions as specified on this permit. All debris from construction activity shall be removed as it is generated. Call Construction Inspection at 757-933-2311 prior to starting work and again anytime work is being performed within the right-of-way. This is required for inspection and/or notification purposes. Vehicles and pedestrians shall not pass under the work area or under any lines that are not secure. Traffic shall be stopped when work is being preformed across the roadway. NOTICE: The approved permit and traffic control plan must be on site at all times. All curb, gutter and sidewalk within the right-of-way must be protected from damage at all times. Contact the inspector prior to beginning work in order for the area to be visually inspected. If you do not have the curb, gutter and sidewalk inspected prior to work, you will be responsible for repairing any/all damage to the curb, gutter and/or sidewalk. *****************************WORK HOUR RESTRICTIONS****************************** Single lane closures shall abide by Work Hour Restrictions for Lane Closures https://www.nnva.gov/DocumentCenter/View/32404/2018-Work-Hour-Restriction?bidId= No work is permitted from February 26, 2024 to March 3, 2024 due to the One City Marathon. Pavement surfaces along the race route shall be free of debris and safe for runners to the satisfaction of the city inspector. All construction areas shall be secured. New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas Day: Lane closures are not permitted from noon on the preceding weekday through noon of the following weekday. If the observed holiday falls on a Monday, lane closures are not permitted from noon on the preceding Friday through noon on the following Tuesday. There shall be no lane closures between noon on the Wednesday before Thanksgiving Day through noon on the Monday after Thanksgiving. APPROVALS Cassandra Wilkinson Permittee Signature City Agent
Jump to an indexed page (2 of 2)

Report a privacy or text-extraction issue through publication requests.