Exhibit A
Off-site Improvements
芦 Site Entrance Improvements:
掳
Develop a northbound right-turn lane with a minimum of 100 feet of
storage and a 100-foot taper at the proposed right-in site entrance on
Jefferson Avenue.
Develop a northbound right-turn lane with a minimum of 150 feet of
storage and a 100-foot taper at the signalized Jefferson Avenue/Boykin
Lane intersection.
Develop a southbound left-turn lane with at least 250 feet of storage anda
100-foot taper at the signalized Jefferson Avenue/Boykin Lane intersection.
Develop an eastbound right-turn lane with at least 100 feet of storage and a
100-foot taper at the unsignalized site entrance on Bland Boulevard.
Develop a westbound left-turn lane with at least 100 feet of storage and a 100-
foot taper at the unsignalized site entrance on Bland Boulevard.
+ Jefferson Avenue/Bland Boulevard
掳
Extend the southbound left-turn lanes from 200 feet of full-width storage
to 350 feet of full-width storage for the dual turn lanes to reduce the
potential for the southbound through-lane queues on Jefferson Avenue to
block access to the left-turn lanes.
芦 Jefferson Avenue/Boykin Lane/Site Entrance
掳
Install a raised median on the north leg of the intersection wide
enough to act as a pedestrian refuge for a two-stage crossing of
Jefferson Avenue. This will reduce the required pedestrian clearance
time given the long crossing distance.
To accommodate a southbound left-turn lane and the associated signal head,
the mast arm in the southwest quadrant of the intersection where the
southbound signal heads are currently mounted will likely need to be
extended.
芦Traffic Signal Timing
掳
With the proposed introduction of a southbound left-turn movement at
the Jefferson Avenue/Boykin Lane intersection, the signal timing and
coordination patterns along Jefferson Avenue should be
evaluated/updated near build-out of the site to maintain existing levels
of operation and coordination along the corridor.