INDEPENDENT LOCAL NEWSNewport News, Virginia
Back to the record

Document text 路 Page 3 of 6

Blight completeness audit: parcel history, Haven and InTown records

Text from the approved public copy. Page numbers follow the PDF sequence.

Open Source Document

Document page

Page options

This page uses extracted PDF text. Text can misread numbers, dates or table columns. Check the PDF before quoting or interpreting it. Redacted areas remain redacted.

AUDIT NEWPORT NEWS | ANN selected evidence | Reviewed November 1, 2026 3 Haven: the trade-final gap is now answered ANN selected-field transcription and analysis, not a City-issued report. Observed November 1, 2026. Resident, unit/location and private contact fields are omitted. The underlying public trade records corroborate the dates reported in the later code-case note. Both trade permits match the building permit's parcel and exact recorded location. HVAC-2025-0212 also explicitly references UNSAFE-2025-0069. Record Recorded status Verified date / relationship ELEC-2025-0421 Closed Finalize Date: 2025-11-06 BINS-041279-2025 Approved Actual Date: 2025-11-06; explicitly linked to ELEC-2025-0421 HVAC-2025-0212 Closed Finalize Date: 2025-11-06 BINS-041273-2025 Approved Actual Date: 2025-11-06; explicitly linked to HVAC-2025-0212 BLDC-2025-0523 Closed Finalize Date: 2025-11-07 These trade approvals, building-permit finalization, later failed code inspections and December 29, 2025 Passed code inspections/closure are separate events. The dates are not treated as an inherent contradiction. The two 2025 code cases' compliance closures do not clear later February/April 2026 cases. Later repair activity now identified Permit Status Selected scope / reference BLDC-2026-0564 Pending Truss replacement, framing, drywall and roofing. Description explicitly references FIRE-2026-0017 and asbestos permit BLDC-2026-0590. BLDC-2026-0590 Issued 2026-10-13 Removal/disposal of identified asbestos-containing materials. No final-date value in the selected record. The application and issued abatement permit establish documented repair steps. They do not establish completed structural repairs, finished abatement, an exposure finding, current occupancy, acceptance testing or permission to reoccupy. Underlying completion and occupancy decisions remain needed.
Jump to an indexed page (6 of 6)

Report a privacy or text-extraction issue through Contact & Corrections.