INDEPENDENT LOCAL NEWSNewport News, Virginia
Record status
Listed in source roster
Source date / period
May 2026

Profile details

Page options

Employment record

Public institution
City of Newport News
Department / office / school
Engineering
Position / title
Engineer III
Source type
Roster assignment
Classification / role type
General Schedule
Record status
Listed in source roster
Source date / period
May 2026

The roster records an assignment at the stated date. It does not establish employment status today.

Employment source [1]

Original roster wording & label sources
Name in source
JENNIFER BUTLER
Department in source
Engineering
Position in source
ENGINEER III

Common job-title abbreviations are expanded for readability. Original wording, job levels and compensation matches are preserved.

Official compensation job classification [2]

Official organization name source [3]

Salary & compensation

Published role range

$93,332.68 – $118,372.46

This annual amount is matched to the department and job classification. The underlying compensation file does not name employees, so it cannot verify Jennifer Butler’s individual pay.

September 2026 published dataset; downloaded October 1, 2026. The minimum and maximum describe the matching role group, not this person’s earnings.

Compensation source [2]

Contribute a dated public salary record

Public records & case history 0

Dated professional records, case roles and court outcomes. Lawsuit allegations are identified separately from findings.

No verified professional, licensure, certification or case record is attached to this profile.

Notes 3

Identified by the city as project manager for Jefferson Avenue sidewalk improvements between Shields Road and Sea Pine Lane, including accessible pathways, crossings and amenities at two existing HRT bus stops.

Reviewed: November 14, 2026

City of Newport News project register, reviewed November 14, 2026 [4]

The City’s project register identifies Jennifer Butler as project manager for the 16th Street Complete Streets project between Ivy and Marshall avenues, redesigning the corridor for pedestrians, cyclists and motorists.

Reviewed: November 14, 2026

Newport News project register, reviewed November 14, 2026 [5]

The City's project register names Jennifer Butler as project manager for the Rock Landing Drive/Omni Boulevard traffic-signal and turn-lane installation (UPC 111065). The described scope includes a mast-arm signal, turn lanes, pedestrian pushbuttons and displays, emergency-vehicle preemption equipment and video detection to improve intersection safety.

Reviewed: November 18, 2026

City project register: Rock Landing Drive and Omni Boulevard traffic signal and turn lanes [6]

References 7

  1. City FOIA Employees by PositionEmployee roster · Period: May 2026 · Tracker row ID 176 · Source page 2
  2. Employee compensation — September 2026Compensation dataset · Document date: September 1, 2026 · Downloaded: October 1, 2026 · Checked: October 1, 2026 · Period: September 2026 published dataset; downloaded October 1, 2026 · Source department: Engineering · Job classification: ENGINEER III
  3. Official organization name sourceOrganization label source · Checked: October 8, 2026
  4. City of Newport News project register, reviewed November 14, 2026Professional record · Reviewed: November 14, 2026
  5. Newport News project register, reviewed November 14, 2026Professional record · Reviewed: November 14, 2026
  6. City project register: Rock Landing Drive and Omni Boulevard traffic signal and turn lanesProfessional record · Reviewed: November 18, 2026
  7. Directory sources and verificationMethodology