The official City department index includes this organization. Listed staff assignments come from dated roster and public-directory sources; a complete current employee list has not been verified. Official source
Published role range$118,636.81 – $126,161.59Role compensation; not a verified personal salary.
Identified by the city as project manager for Pump Station 044 Condition Assessment and Odor Control, covering assessment and repair planning for the city’s largest pump station.
Published role rate$160,947.10Role compensation; not a verified personal salary.
The Virginia licensing board’s Winter 2019 Dimensions newsletter lists Kenneth Bryan Stilley II among professional engineers newly licensed by examination during November 4, 2017–November 7, 2018. This records a historical licensing milestone; it is not a check of current license status or renewal.
Published role range$79,384.95 – $79,953.75Role compensation; not a verified personal salary.
At City Council’s November 13, 2018 work session, Stroinski presented the Leadership Development Academy II team’s Peterson Yacht Basin project. The presentation proposed reopening the park, creating historical signage and reconnecting the waterfront site with surrounding streets. These were project recommendations, not confirmation that the improvements were built.
Published role range$93,332.68 – $118,372.46Role compensation; not a verified personal salary.
Identified by the city as project manager for the Newmarket Creek Drainage Analysis project, whose scope includes stormwater facilities at Watkins School and 270 Benns Road and channel widening.
Published role range$81,086.14 – $93,101.97Role compensation; not a verified personal salary.
Identified by the city as inspector for repairs to the southbound Mercury Boulevard bridge over the CSX railway, including slope protection, concrete, bridge-deck and expansion-joint repairs.
Published role range$93,332.68 – $118,372.46Role compensation; not a verified personal salary.
Identified by the city as project manager for Oyster Point Widening II, a Smart Scale project covering additional through lanes, pedestrian accommodations and traffic-signal timing improvements.
Published role range$81,086.14 – $93,101.97Role compensation; not a verified personal salary.
Identified by the city as inspector for Warwick Boulevard Drainage Improvements, covering storm-sewer improvements from Raleigh Road to the Government Ditch, resurfacing and associated concrete repairs.
Published role rate$80,780.55Role compensation; not a verified personal salary.
EPA’s June 2017 Storm Smart Schools guide credits Watts with supporting the project. The guide resulted from a year-long collaboration among EPA, NNPS and the city to integrate green stormwater infrastructure with regulatory compliance and environmental literacy.
Published role range$93,332.68 – $118,372.46Role compensation; not a verified personal salary.
The City's adopted FY2025–FY2029 Capital Improvements Plan names David T. Wilkinson in Engineering as contact for the Annual Utilities Undergrounding Program, supporting traffic-signal conversions and improved utility reliability. This is a May 2024 planning-document assignment, not confirmation of completed projects.
Published role range$91,850.34 – $100,604.17Role compensation; not a verified personal salary.
Identified by the city as project manager for FloodREADY Homes, a three-year initiative designed to assess 150 owner-occupied homes in high-flood-risk neighborhoods and recommend household-level flood mitigation.
Published role range$107,000 – $121,952.67Role compensation; not a verified personal salary.
Identified by the city as project manager for the Virgil I. Grissom Library Replacement, a project to build a new facility in place of the existing library.